Servicing Tube and Link grilles, London

Shutter scaffolding

Four storey house in Chelsea

In order to service these 15 Tube & Link grilles at a house in London, we hired a 7 meter scaffold tower, and set about ensuring the shutters are soundly fixed to the brick face of the house, and repairing any endlocks, links and motors on them. The work took two days, and required a head for heights. 

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.